BUR-Bonded-Systems

Our Cold Fusion Bonded Built-Up Roof System utilises zero flame, zero heat technology to eliminate the need for hot works on roofs. It consists of a vapour control layer, Decotherm insulation, a carrier membrane, and a Decothane waterproofing ‘cap sheet’. The complete system is fully bonded with Decostik® - a revolutionary cold fusion adhesive, and is guaranteed to last for 15, 20, or 25 years depending upon the chosen system.

The new cold applied formulation exceeds the highest industry standards for roofing systems and avoids the problems associated with hot works, such as a high fire risk and ever increasing insurance premiums.


ProductGuarantee Substrates
     
Cold Fusion Bonded Omega 15 15 Years
  • Asphalt
  • Concrete
  • Felt
  • Metal Deck
  • Plywood
  • Single Ply
  • Stripped Concrete
  • Stripped Metal
  • Stripped Plywood
Cold Fusion Bonded Gamma 20 20 Years
  • Asphalt
  • Concrete
  • Felt
  • Metal Deck
  • Plywood
  • Single Ply
  • Stripped Concrete
  • Stripped Metal
  • Stripped Plywood
Cold Fusion Bonded Delta 25 25 Years
  • Asphalt
  • Concrete
  • Felt
  • Metal Deck
  • Plywood
  • Single Ply
  • Stripped Concrete
  • Stripped Metal
  • Stripped Plywood

Cold Fusion Bonded Built-Up Roof System

Cold Fusion Bonded Built-Up Roof System

Built-Up Roof System in Detail

Built-Up Roof System in Detail

Built-Up Roof Upstand Detail

Built-Up Roof System in Detail

Our Built-Up Roof system can be easily applied around all detail areas

Built-Up Roof Decolight Detail

Built-Up Roof System in Detail

All rooflights can also be easily included in the system.

Built-Up Roof Soil Vent Pipe Detail

Built-Up Roof System in Detail

Roof accessories are available from Liquid Plastics.

Case Studies

Physio Gym Physio Gym - Norwich Community Hospital Explore

The Enterprise Centre The Enterprise Centre Explore

for more information please call us on 01772 259781